Enquiries ready for estimating.
Emails, drawings and spreadsheets become a structured brief. We extract stated requirements and flag gaps, so engineering can focus on feasibility and costing instead of finding attachments.
RFQ-118 email · drawing DR-091.pdf
“Please quote 120 brackets using the attached drawing, tolerance ±0.1 mm.”
Quoting brief · RFQ-118
- Part
- Bracket DR-091
- Batch
- 120 units
- Tolerance
- ±0.1 mm
Confirm material and drawing revision before pricing.